
Change Order For An Amount In Addition To The Contract Price Form
Use a Change Order For An Amount In Addition To The Contract Price template to make your document workflow more streamlined.
What this change order form does
A Change Order For An Amount In Addition To The Contract Price Form records an approved increase to an existing contract price. It identifies the original agreement, describes the added work or cost, states the additional amount, and documents approval by the parties. In U.S. commercial and construction transactions, the signed change order becomes supporting contract evidence when it clearly connects the price adjustment to the underlying agreement. signNow lets a sender upload the form, place fields, route it to authorized signers, and preserve the completed document with an audit trail.
Who uses this change order form
Construction teams
Owners, general contractors, subcontractors, and project managers use the form to document added work, approved pricing, and authorization before performing work outside the original contract.
Business contracting
Commercial clients, vendors, and legal or procurement teams use it to preserve a clear written record when an existing agreement requires an additional amount.
Features that support accurate change orders
signNow organizes the change order from document preparation through approval, signing, audit evidence, and record retention.
Contract linkage
Record the original contract reference, approved scope change, added amount, and resulting contract price in one signed document for easier review.
Guided completion
Place signer, date, amount, and approval fields directly on the uploaded form so each party completes the same version.
Signer routing
Route the change order to the contractor, owner, client, or other authorized representatives in the required signing order.
Audit evidence
Capture timestamps, signer actions, and completion records that help connect approval to the final executed change order.
Record control
Keep the executed form with the underlying contract and related project records for organized future reference.
Reusable template
Use reusable templates when the same change order structure applies across projects, while preserving project-specific amounts and descriptions.
Complete the form in signNow
Use this sequence to prepare, sign, and retain the change order without losing the connection to the original contract.
Upload form:
Upload the completed change order PDF to signNow. Check fields:
Review detected fields and add amount, date, and signature fields. Route approval:
Add authorized parties and set the signing order. Send document:
Send the change order for electronic signatures. Store record:
Review the completed PDF and audit trail before filing.
- Best ROI. Our customers achieve an average 7x ROI within the first six months.
- Scales with your use cases. From SMBs to mid-market, airSlate SignNow delivers results for businesses of all sizes.
- Intuitive UI and API. Sign and send documents from your apps in minutes.
Recommended change order setup
Configure the document so the added amount, approval identity, signing event, and final record remain connected to the underlying contract.
| Setting | Recommendation |
|---|---|
| Authentication method | Email link with SMS verification |
| Signature type | Electronic signature with intent |
| Audit trail | Enabled with completion certificate |
| Document retention | Retain with contract records |
| Encryption | TLS 1.2/1.3 and AES-256 |
What the audit trail records
The audit trail creates a technical record of who handled the change order, what occurred, and when the signed document was completed.
Authenticate signer:
Capture timestamps:
Hash document:
Seal record:
Build certificate:
Export trail:
Processing the change order
No universal federal deadline applies to this contract amendment; follow the agreement, project schedule, and any applicable state-law requirements.
Prepare document
Send to signers
Collect signatures
Complete and archive
Security for signed change orders
Transport encryption:
Storage encryption:
Control assurance:
Security certification:
Electronic signatures:
Activity evidence:
Avoiding change order documentation gaps
The added amount may be approved without a sufficiently specific description connecting the increase to the original contract. Different versions can circulate when the revised contract price and effective date are not confirmed before signing. A project representative may sign without documented authority to approve an increase for the contracting party. Email approvals can be difficult to authenticate when the final change order lacks a complete audit trail.
Risks of an incomplete change order
Disputed authorization
Contract ambiguity
Payment dispute
Audit deficiency
Legal standing of an electronic change order
Under ESIGN, 15 U.S.C. chapter 96, and applicable state electronic-transactions law, an electronic change order may carry the same legal effect as a paper record when intent, consent, signer attribution, and reliable retention are established. UETA generally governs intrastate transactions; New York uses ESRA. Wills, certain court orders, family-law decrees, and other statutory exceptions remain outside this framework.

Best practices for keeping change orders
Accurate linkage, authorized approval, complete evidence, and a documented retention decision make the added contract amount easier to administer.
Identify the underlying contract
Document the price calculation
Export the signed evidence
Set the applicable retention rule
Pricing context for change orders
signNow pricing and feature details below use the supplied annual-billing data; competitor values are marked when they are not verified.
| Features | signNow | DocuSign | Adobe Sign | PandaDoc | Dropbox Sign |
|---|---|---|---|---|---|
| Starting annual price | $8/user/month, Business | Not verified | Not verified | Not verified | Not verified |
| Free trial availability | 7 days, no card | Not verified | Not verified | Not verified | Not verified |
| Bulk send availability | Business Premium, $15/user/month | Not verified | Not verified | Not verified | Not verified |
| Audit trail availability | Included in Business | Not verified | Not verified | Not verified | Not verified |
| Subscription invite limits | 100 invites per user annually | Not verified | Not verified | Not verified | Not verified |
Change order form troubleshooting
Resolve field, routing, evidence, plan, retention, and consent questions before treating the revised contract price as fully approved.
Upload the original PDF again, then inspect detected fields before sending. signNow allows you to place or adjust signature, date, and amount fields manually when automatic detection does not match the change order layout.
Use signNow’s routing controls to add the owner, contractor, or other authorized representative in sequence. The Business plan includes templates and audit trails; confirm every recipient’s authority before sending the revised contract price.
A completed change order can support attribution when the signer demonstrated intent, consented to electronic records, and the record remains reproducible. ESIGN and UETA provide the framework, but contract and state-law requirements still apply.
The Business plan is listed at $8 per user per month when billed annually and includes 100 signature invites per user annually. Additional invite fees may apply; Business Premium adds bulk send for $15 per user monthly annually billed.
Download the completed change order and its audit evidence after all required signatures are collected. Store both with the original agreement and project records, following the retention period required by your contract or industry rule.
For consumer-facing transactions, ESIGN requires disclosure of the right to paper records, electronic-access capability, and consent-withdrawal procedures under 15 U.S.C. §7001(c). Add those disclosures when the change order is presented to consumers.
Key performance indicators that demonstrate SignNow's proven track record.
BE READY TO GET MORE
Get this form now!
If you believe that this page should be taken down, please follow our DMCA take-down process.