Schedule Of Values Form

Get a Schedule Of Values Template 0 template with airSlate SignNow and complete it in a few simple clicks.

What a Schedule Of Values Form does

A Schedule Of Values Form breaks a construction contract into priced work items so project parties can track scope, earned progress, retainage, and payment requests against an agreed total. It usually lists divisions or cost codes, descriptions, scheduled values, prior applications, current work, stored materials, completed amounts, and remaining balances. With signNow, a contractor can upload the schedule, auto-detect fillable fields, send it to designated reviewers or signers, and preserve the completed document with its audit trail. The form supports project administration; it does not replace contract terms, statutory lien notices, or lender requirements.

Who benefits from structured schedules

Construction businesses use the form to align project scope, cost allocation, approvals, and payment documentation before work progresses.

  • Solo contractors use Schedule Of Values Form to present labor, materials, and subcontract costs clearly before requesting progress-payment approval from owners or lenders.
  • Regional general contractors standardize subcontractor schedules with reusable templates, controlled approvals, and audit trails that connect each payment request to defined project line items.
  • Enterprise construction groups coordinate project managers, accounting teams, and owners through role-based signNow workflows for consistent schedule updates across multiple active jobs.

These tasks are executed by both individual contributors and centralized administrators depending on organizational policy and required controls.

How the schedule workflow works

A Schedule Of Values Form moves from project cost breakdown to controlled review, signature, and auditable storage in four focused stages.

  • Upload the form: Upload the project schedule and identify each cost-code row.
  • Prepare fields: Auto-detect fillable fields, then place missing amount and approval fields.
  • Route for signing: Add contractors, owners, or reviewers in the required signing order.
  • Archive securely: Store the completed schedule and audit trail with the project record.

Complete the schedule in signNow

Use this sequence to prepare, route, and preserve a Schedule Of Values Form for construction project review.

  • Upload document:

    Upload the project-specific Schedule Of Values Form.
  • Review fields:

    Check detected fields and add missing cost entries.
  • Add recipients:

    Assign owners, contractors, or reviewers as signers.
  • Send for signing:

    Send the schedule and monitor completion status.
be ready to get more
Get legally-binding signatures now!
  • Best ROI. Our customers achieve an average 7x ROI within the first six months.
  • Scales with your use cases. From SMBs to mid-market, airSlate SignNow delivers results for businesses of all sizes.
  • Intuitive UI and API. Sign and send documents from your apps in minutes.

Features for Schedule Of Values Form

signNow combines field preparation, ordered approvals, reusable construction templates, and audit-ready records for Schedule Of Values Form workflows.

Structured fields

Place structured fields over cost-code descriptions, scheduled values, current work, stored materials, retainage, and approval areas so each project schedule follows a consistent layout.

Signer routing

Send the prepared Schedule Of Values Form to contractors, owners, architects, or lenders in a defined order, reducing uncertainty about who must review each payment schedule.

Reusable templates

Reuse an approved project template for recurring payment applications while preserving the line-item structure that project administrators and accounting teams already recognize.

Audit trail

Capture signer identity, timestamps, actions, and completion history so project records show when each party reviewed or approved the schedule.

Mobile approvals

Use mobile apps for field approvals when project participants work away from the office, while maintaining the same signed document and completion record.

System connections

Connect the completed schedule with tools such as Procore, NetSuite, Google Drive, Box, or Microsoft 365 for organized project recordkeeping.

Recommended workflow setup

Configure Schedule Of Values Form workflows around controlled access, identifiable approvals, and retrievable project records.

SettingRecommendation
Authentication and signature methodEmail verification with typed or drawn signature
Audit trailRetain completion certificate with timestamps
Document retentionKeep project records through contract requirements
EncryptionUse TLS 1.2/1.3 and AES-256
User provisioningAssign role-based access through shared templates

Connect project schedules to business systems

Connect Schedule Of Values Form workflows with construction, finance, storage, and collaboration systems to move approved project data without repeated manual entry.

Salesforce
Procore
Zapier
Microsoft Teams
Hub spot
Box
Microsoft

Security for signed schedules

Data encryption:

TLS 1.2/1.3 and AES-256

Security certification:

SOC 2 Type II certified

Information security:

ISO 27001 certified

Electronic signatures:

ESIGN and UETA compliant

Protected information:

HIPAA compliance with BAA

Audit records:

Detailed signer history

Best practices for project schedules

Accurate line items, controlled editing, linked project records, and documented review make a Schedule Of Values Form more useful during construction payment administration.

Reconcile every line with the contract

Use the executed construction agreement to build each row, then reconcile scheduled values to the contract sum. Separate labor, materials, stored materials, subcontractor work, and retainage where the project’s payment process requires those distinctions. Do not rely on auto-detection to verify financial accuracy.

Restrict edits to responsible parties

Create one controlled template containing project identifiers, cost codes, scheduled values, and approval fields. Lock the layout before sending, and assign editable fields only to the party responsible for the corresponding project information or certification.

Preserve the signed schedule and audit trail

Export or retain the completed Schedule Of Values Form together with its signNow audit trail, contract version, and supporting approval records. Use a project folder with controlled access so later reviewers can connect the signed schedule to its underlying agreement.

Review payment calculations before sending

Before requesting signatures, compare current work, stored materials, prior applications, retainage, and remaining balances. Have the project manager and accounting reviewer resolve discrepancies before the schedule reaches the owner or lender.

Risks of incorrect schedules

Project managers

Construction project managers use shared Schedule Of Values Form templates to standardize cost-code entries, assign completion roles, and delegate sending to site administrators without granting every contributor full workspace control.

Finance administrators

Finance administrators review approved line items, manage signNow roles, and preserve completed payment schedules with audit trails while field teams submit updates through delegated sending workflows.

General contractors

General contractors maintain reusable templates for subcontractor billing, limit editing permissions, and route revised schedules to designated approvers before retaining the signed record.

Project managers

Construction project managers use shared Schedule Of Values Form templates to standardize cost-code entries, assign completion roles, and delegate sending to site administrators without granting every contributor full workspace control.

Schedule Of Values Form troubleshooting

Resolve field, access, plan, legal, retention, and reconciliation questions before circulating a construction payment schedule.

Upload the original project PDF again, then use signNow’s field detection and manually add any missing cost-code or approval fields. Confirm that each field is assigned to the contractor, owner, architect, or lender responsible for that entry before sending.

A signer can usually complete the document from an email link without creating an account. If access fails, verify the recipient address, resend the invitation, or provide a signNow signing link through the approved project channel.

Business includes templates and audit trails at $8/user/month with annual billing. Business Premium is $15/user/month and adds bulk send, while Enterprise is $30/user/month and adds advanced signer authentication and conditional fields.

signNow supports ESIGN and UETA compliance, but the construction contract and applicable state law still control the transaction. Preserve signer intent, consent, attribution, the final record, and the audit trail for evidentiary use.

Use signNow’s audit trail and completion record to show timestamps, signer actions, and document history. For projects involving regulated information, confirm whether HIPAA obligations apply and obtain a BAA where required.

Check every scheduled value, current-work amount, stored-material amount, retainage figure, and remaining balance against the underlying construction contract. signNow can preserve approvals, but it does not validate construction arithmetic or contractual accuracy.

ROI at a Glance

Key performance indicators that demonstrate SignNow's proven track record.

28M+Documents signed
13+Years in business
4.6/5Average G2 rating

BE READY TO GET MORE

Get this form now!

If you believe that this page should be taken down, please follow our DMCA take-down process.