Download signNow app
4.7 / 5 rating on

Contract Change Order Form

Use a Contract Change Order template to make your document workflow more streamlined.

What a contract change order does

A Contract Change Order Form records an agreed modification to an existing contract, such as changed scope, price, materials, schedule, or responsibilities. It identifies the original agreement, describes the revision, states the financial and timing effect, and captures approval from authorized parties. With signNow, a sender uploads the form, reviews detected fillable fields, assigns signer roles, sends it electronically, and stores the completed document with its audit trail. The signed change order preserves the approved amendment alongside the underlying contract for later administration or dispute review.

How to complete the change order

Prepare the revised scope, price, schedule, and approvals before sending the Contract Change Order Form through signNow.

  • Upload document:

    Upload the current change order template to signNow.
  • Check fields:

    Review detected fields and add missing amount, scope, and approval fields.
  • Assign roles:

    Assign each field to the contractor, owner, or authorized approver.
  • Send for signing:

    Send the completed change order for electronic signatures.

Features for contract change orders

signNow combines field preparation, assigned approvals, electronic signing, audit trails, and integrations for documenting amendments to existing contracts.

Structured revisions

Capture the revised scope, price, schedule, and responsibilities in one amendment, giving project teams a specific record of what changed from the underlying contract.

Role-based signing

Assign signature and approval fields to named parties, so the contractor, owner, manager, or other authorized representative reviews the exact change order section relevant to them.

Reusable templates

Use detected fillable fields and reusable templates to prepare recurring change orders while preserving project-specific amounts, dates, and descriptions.

Audit trail

Store the completed document with a signNow audit trail recording signer actions and timestamps, supporting later contract administration and evidence review.

Flexible delivery

Send a change order by email or signing link, allowing authorized parties to review and sign on desktop or mobile devices.

System integrations

Connect approved documents with systems such as Procore, NetSuite, Salesforce, or Google Drive for more consistent project and record management.

Recommended change-order workflow setup

Use a controlled setup that links each signed amendment to the underlying contract, authorized parties, and applicable record policy.

SettingRecommendation
Authentication methodEmail link with SMS OTP
Signature typeElectronic signature with signer intent
Audit trailExport completion certificate with signed PDF
Document retentionRetain under the contract record policy
EncryptionTLS 1.2/1.3 and AES-256 at rest
be ready to get more
Get legally-binding signatures now!
  • Best ROI. Our customers achieve an average 7x ROI within the first six months.
  • Scales with your use cases. From SMBs to mid-market, airSlate SignNow delivers results for businesses of all sizes.
  • Intuitive UI and API. Sign and send documents from your apps in minutes.

What the audit trail records

A signNow audit trail documents the technical history of a Contract Change Order Form after it is prepared, delivered, reviewed, and signed.

01

Authenticate signer:

Records the signer’s authentication event before approval.
02

Capture timestamps:

Captures date, time, and action timestamps.
03

Hash document:

Associates the signed document with its recorded hash.
04

Seal record:

Preserves completed content in a tamper-evident record.
05

Track actions:

Logs each review, signature, and document action.
06

Export trail:

Allows authorized users to retrieve or export evidence.

Signer authentication and certificates

Digital certificates:

PKI certificate support

X.509 signatures:

X.509 certificate workflows

Two-factor authentication:

Two-factor authentication

SMS OTP:

SMS one-time passcodes

ID verification:

Identity verification options

Authentication records:

Signer event records

Platform requirements for signing

Use signNow over TLS 1.2 or 1.3 in Chrome, Firefox, Safari, or Edge on Windows 10/11 or macOS. signNow also provides mobile apps for iOS and Android, allowing authorized parties to review and sign a Contract Change Order Form away from the office.

  • Browsers Chrome, Firefox, Safari, Edge
  • Desktop systems Windows 10/11, macOS
  • Mobile systems iOS, Android

Organizations should manage access through approved devices, role-based permissions, and documented signer authorization. Enterprise deployments may connect signNow through API integrations or SSO, while regulated workflows should configure authentication, audit-trail access, and retention according to the contract record and applicable industry requirements.

Connect change orders to business systems

Route Contract Change Order Form data through Salesforce, NetSuite, Procore, Microsoft 365, Google Drive, Box, or other signNow integrations for faster approvals and organized records.

Salesforce
Procore
Zapier
Microsoft Teams
Hub spot
Box
Microsoft

Best practices for contract changes

Accurate scope, controlled approvals, and traceable records make a signed Contract Change Order Form easier to administer and defend.

Identify the original contract

Name the underlying contract, amendment number, effective date, and parties before describing revised work. This creates a direct link between the change order and the agreement it modifies, reducing version ambiguity during approval, invoicing, and later contract administration.

Detail scope and pricing

Separate added work, deleted work, unit prices, credits, taxes, and the revised contract total. State whether the change affects the completion date or milestones, and require the responsible parties to approve every financial and schedule consequence.

Preserve the audit trail

Export the completed signNow audit trail with the signed PDF. Preserve signer identities, timestamps, authentication events, and document history in a controlled repository with access limited to authorized contract and finance personnel.

Apply the correct retention rule

Set retention according to the record category and governing rule, not a universal period. For example, retain qualifying tax records three years under IRC §6501(a), while state contract requirements may differ.

Pricing for change order workflows

The comparison uses verified signNow pricing and marks unavailable competitor information as Not verified rather than estimating it.

FeaturessignNowDocuSignAdobe SignPandaDocDropbox Sign
Starting annual price$8/user/month Business planNot verifiedNot verifiedNot verifiedNot verified
Free trial7 days, no card requiredNot verifiedNot verifiedNot verifiedNot verified
Bulk sendBusiness Premium includes itNot verifiedNot verifiedNot verifiedNot verified
Audit trailIncluded with Business planNot verifiedNot verifiedNot verifiedNot verified
HIPAA supportCompliant; BAA requiredNot verifiedNot verifiedNot verifiedNot verified

Business types using change orders

Contractors, construction companies, and enterprise procurement teams use this form to document approved changes before revised work proceeds.

  • Solo contractors can document client-approved scope, price, and schedule changes from a phone, preserving signed evidence without arranging another office meeting.
  • Construction firms can route subcontractor and owner approvals through role-based signing workflows, keeping revised work orders connected to project administration and payment records.
  • Enterprise procurement teams can connect change-order approvals to NetSuite, Procore, or Salesforce, improving control over amendments across multiple projects, departments, and authorized signers.

These tasks are executed by both individual contributors and centralized administrators depending on organizational policy and required controls.

ROI at a Glance

Key performance indicators that demonstrate SignNow's proven track record.

28M+Documents signed
13+Years in business
4.6/5Average G2 rating

Troubleshooting contract change orders

These answers address signing, plan, authentication, and compliance questions that arise when a Contract Change Order Form changes an existing agreement.

Business includes legally binding eSignatures, templates, and audit trails for a Contract Change Order Form. Confirm the sender has placed fields for every required approval and that each signer’s email identifies the intended contracting party before sending.

Business Premium adds bulk send, but a single change order usually needs individually assigned parties and project-specific amounts. Use bulk send only when the same approved template is being distributed with controlled, repeatable field values.

An electronic signature does not automatically replace a notarization, recording requirement, or other state-law formality. Check the governing contract and applicable state law before treating a signed change order as sufficient for a deed or excluded document.

signNow lists HIPAA compliance with a BAA required. A construction or commercial change order normally does not involve protected health information, but healthcare-related records require documented access, retention, and BAA controls before including PHI.

The Site License is listed at $1.50 per signature invite and adds SSO and full API access. Business is listed at $8 per user per month when billed annually; subscription plans include 100 signature invites per user per year.

If a signer cannot open the request, confirm the email address, resend the invitation, or provide a signNow quick invite link where appropriate. Keep the original document version unchanged and verify the audit trail after completion.

BE READY TO GET MORE

Get this form now!

If you believe that this page should be taken down, please follow our DMCA take-down process.