
49 Method Statement Forms And Templates
Use a 49 Printable Method Statement Forms And Templates 2021 template to make your document workflow more streamlined.
What these method statement templates are
49 Method Statement Forms And Templates are reusable construction and workplace-safety documents that explain how a specific task will be performed, controlled, and reviewed. A completed method statement normally identifies the work activity, sequence, hazards, control measures, equipment, competent personnel, emergency arrangements, and approval responsibilities. In signNow, a team uploads the chosen template, adds project-specific information, assigns fields to supervisors or contractors, and routes the document for electronic signatures. The completed PDF and audit trail provide a dated record of the approved working method, subject to the project contract and applicable state requirements.
Who benefits from these templates
Method statement templates help contractors, project teams, and enterprise safety departments document task controls consistently before work begins.
Solo contractors use a reusable risk-control template to document site activities, obtain client approval, and keep signed evidence without maintaining paper folders. Construction companies route task-specific method statements to supervisors, subcontractors, and site managers, preserving approval order and audit trails for each project. Enterprise safety teams standardize templates across projects, connect workflows to systems such as Procore or NetSuite, and control access through centralized administration.
These tasks are executed by both individual contributors and centralized administrators depending on organizational policy and required controls.
How method statement workflows work
A method statement moves from an editable project template to assigned review, electronic signatures, and an auditable completed record.
Upload template: Upload the method statement template to signNow. Complete fields: Add project fields, hazards, controls, and signer roles. Route approvals: Send the method statement to each responsible reviewer. Archive record: Store the signed PDF with its audit trail.
Steps to complete a method statement
Prepare the project-specific document in signNow, route it to responsible reviewers, and preserve the signed result with its completion evidence.
Upload document:
Upload the selected method statement template. Add project data:
Add project details and assigned fields. Assign reviewers:
Set signer order and required approvals. Send for signing:
Send the document through signNow. Store completion:
Download the signed PDF and audit trail.
- Best ROI. Our customers achieve an average 7x ROI within the first six months.
- Scales with your use cases. From SMBs to mid-market, airSlate SignNow delivers results for businesses of all sizes.
- Intuitive UI and API. Sign and send documents from your apps in minutes.
Features for method statement workflows
signNow combines reusable document preparation, assigned approvals, mobile signing, and audit evidence for project-specific method statement records.
Reusable templates
Upload a method statement template and reuse its task, hazard, control, and approval structure across projects without rebuilding the document.
Assigned fields
Assign project details and signature fields to the supervisor, contractor, or client responsible for each approval.
Signing order
Route the method statement in a defined signing order when safety or contract policy requires sequential review.
Audit trail
Capture timestamps, actions, signer information, and completion evidence with the audit trail for each approved document.
Mobile signing
Use mobile apps to review and sign method statements from a jobsite or office when the workflow permits remote approval.
Completed records
Store the completed PDF and supporting audit evidence together for project closeout and later review.
Recommended method statement setup
Configure the workflow around signer identity, approval evidence, secure storage, and the project’s documented retention requirements.
| Setting | Recommendation |
|---|---|
| Authentication method | Email link with SMS OTP |
| Signature type | Typed or drawn electronic signature |
| Audit trail | Enable completion certificate and action history |
| Document retention | Follow contract and state record policy |
| Encryption | TLS 1.2/1.3 and AES-256 at rest |
Find and fill out the correct 49 printable method statement forms and templates
airSlate SignNow helps you fill in and sign documents in minutes, error-free. Choose the correct version of the editable PDF form from the list and get started filling it out.
| Versions | Form popularity | Fillable & printable |
|---|---|---|
| WI CR-215 2021 | 4.8 Satisfied (1460 Votes) | |
| WI CR-215 2009 | 4.8 Satisfied (1624 Votes) |
Processing stages for method statements
Follow each method statement from preparation through signer review, completion, and controlled project-record storage.
Prepare the document
Deliver to signers
Complete signer review
Archive completed records
What the audit trail records
A completed method statement includes technical evidence showing who acted, when they acted, and how the record remained intact.
Authenticate signer:
Capture timestamps:
Hash document:
Seal evidence:
Record activity:
Export audit trail:
Record-keeping practices for method statements
A defensible project file preserves the signed method statement, its audit evidence, and the retention rule used for disposal.
Apply the correct retention period
Export evidence with every completion
Protect archived project records
Document the governing record policy
Why teams look for DocuSign alternatives
Organizations seek alternatives when they need different pricing models, stronger native automation, simpler bulk affidavit workflows, or more flexible identity-verification options than those available in a legacy envelope-based vendor.

Key performance indicators that demonstrate SignNow's proven track record.
Troubleshooting method statement signing
Use these answers to resolve document setup, signer access, plan limits, compliance, and completed-record questions.
Business includes audit trails, templates, and legally binding eSignatures. Upload the method statement, place required fields, assign signers, and send it through the workflow. The completed record can be retained with its audit trail for project evidence.
Business Premium adds bulk send and kiosk mode. Use bulk send when the same method statement must reach multiple named recipients, or kiosk mode when workers sign from a supervised shared device at a project location.
The Business plan includes 100 signature invites per user per year when billed annually, with overage fees. Enterprise also includes 100 annual invites per user. The Site License uses $1.50 per signature invite instead.
signNow supports ESIGN and UETA compliance, but a method statement’s legal effect also depends on the project contract, signer authority, and applicable state law. Preserve intent, consent, attribution, the completed record, and the audit trail.
Use signNow’s audit trail to preserve signer identity details, timestamps, actions, and completion evidence. For records containing protected health information, HIPAA compliance requires a business associate agreement and appropriate organizational safeguards.
If a signer cannot open the document, verify the email address, signing link, required fields, and authentication settings. Resend the invitation after correction, then confirm the final PDF and audit trail show completion.
BE READY TO GET MORE
Get this form now!
If you believe that this page should be taken down, please follow our DMCA take-down process.