How To Complete A Change Order On Construction Projects, Step Form

Use a How To Complete A Change Order On Construction Projects, Step template to make your document workflow more streamlined.

What this construction change order does

How To Complete A Change Order On Construction Projects, Step Form is a project document used to record and approve a change to contracted construction work. It identifies the revised scope, price or cost allowance, schedule effect, responsible parties, supporting documents, and required signatures. The sender uploads the form to signNow, places or reviews fields, assigns owners and contractors, and routes the document for electronic signing. The completed PDF and Audit Trail can then be stored with the project contract. Contract terms and state law determine enforceability and any required notarization or filing.

Who uses this construction change order

Construction teams

General contractors and construction managers use the form to document owner-approved scope changes, revised pricing, schedule extensions, allowances, and responsibility for additional work before directing field execution.

Project stakeholders

Owners, architects, subcontractors, and project administrators review assigned fields, approve the affected work, sign the revised terms, and retain the executed change order with project records.

How the change-order workflow works

Complete the construction change order by preparing its project details, routing approvals, collecting signatures, and preserving the completed record.

  • Upload document: Upload the change-order PDF
  • Add fields: Place fields for amount, scope, and signatures
  • Send for signature: Send the revised order to authorized signers
  • Archive record: Store the executed document and audit trail

Complete and sign the change order

Use this sequence to turn a prepared construction revision into an approved, traceable project record.

  • Upload form:

    Upload the completed construction change-order PDF.
  • Check fields:

    Review detected fields and add missing ones.
  • Assign recipients:

    Assign scope, price, and signature fields.
  • Send order:

    Send the revised order for signing.
  • Store records:

    Download the signed PDF and Audit Trail.

What the change-order audit trail records

The audit trail documents the technical history of the construction change order after routing, signing, and completion.

01

Authenticate signer:

Email, SMS, or identity checks document signer access.
02

Capture timestamp:

The audit record captures when each action occurred.
03

Hash document:

The completed file receives document-integrity protection.
04

Seal record:

Signing events create a tamper-evident completion record.
05

Track actions:

Signer actions remain associated with the change order.
06

Export trail:

Authorized users can retrieve or export audit evidence.
be ready to get more
Get legally-binding signatures now!
  • Best ROI. Our customers achieve an average 7x ROI within the first six months.
  • Scales with your use cases. From SMBs to mid-market, airSlate SignNow delivers results for businesses of all sizes.
  • Intuitive UI and API. Sign and send documents from your apps in minutes.

Features for construction change orders

signNow organizes the specific information and approvals needed when a construction project changes scope, price, schedule, or contractual responsibility.

Structured details

Capture revised work descriptions, quantities, pricing, schedule effects, exclusions, and supporting notes in one structured construction change order.

Field detection

Upload an existing change-order PDF and use detected fillable fields before assigning signature and approval responsibilities.

Approval routing

Route the revised order to owners, contractors, architects, and subcontractors in a defined signing sequence.

Reusable templates

Use templates for recurring construction revisions while keeping project-specific scope and pricing editable.

Audit trail

Preserve signer actions, timestamps, and document history with the completed change-order record.

Project integrations

Connect executed documents with Procore, Box, Egnyte, Google Drive, or other supported systems.

Connect change orders to project systems

Connect construction change orders with project, storage, and business systems to reduce rekeying and preserve approval records.

Salesforce
Procore
Zapier
Microsoft Teams
Hub spot
Box
Microsoft

Manage project users and permissions

  • Construction administrators can create shared change-order templates with required scope, pricing, schedule, approval, and signature fields. Workspace administrators assign roles, control access, and allow delegated sending without giving every project participant full account privileges.
  • Project managers can route a prepared change order to owners, contractors, architects, and subcontractors in the required order. Shared templates and delegated sending reduce repeated setup while preserving each signer’s action history in the completed Audit Trail.

Access the form across project devices

The construction change order can be prepared in signNow through supported desktop browsers or mobile apps. Use current Chrome, Edge, Safari, or Firefox with TLS 1.2 or later, and review scanned documents after upload before assigning fields.

  • Desktop browsers Chrome and Edge on Windows 10 or 11
  • Mac browsers Safari and Chrome on macOS 12 or later
  • Mobile apps iOS and Android signNow mobile apps

Project teams should use managed Windows, macOS, iOS, or Android devices when change orders contain contract prices, personal contact information, or proprietary drawings. Administrators can apply access controls, SSO provisioning, API policies, and repository permissions appropriate to the project’s contractual and regulatory requirements.

Authenticate change-order signers securely

Signer authentication:

Email link confirms signer access

Two-factor authentication:

SMS OTP adds second-factor verification

Identity verification:

ID verification strengthens signer attribution

PKI certificates:

PKI supports certificate-based signatures

X.509 certificates:

X.509 certificates support digital signatures

Signing evidence:

Audit records capture signing events

Preserve evidence for each change order

A clear recordkeeping process helps connect the approved construction revision to its scope, price, schedule, and signing history.

Document every scope and cost change

Record the approved scope revision, cost impact, schedule adjustment, and effective date directly in the change order before sending it. Keep supporting drawings, quotations, and owner instructions linked or stored with the executed document so the project file explains why the contract changed.

Export the audit trail with the signed order

Use signNow Audit Trails to preserve signer identity, timestamps, IP information, and action history with the completed change order. Export the audit record with the signed PDF when transmitting the approved revision to the owner, contractor, architect, or project administrator.

Apply the governing project retention policy

Retain the executed change order according to the project contract, applicable state construction requirements, and your organization’s records policy. Federal rules do not establish one universal retention period for construction change orders, so confirm requirements with counsel.

Archive the original signed record securely

Store the signed PDF and audit trail in a controlled repository such as Box, Egnyte, Google Drive, or an approved construction platform. Limit editing rights after execution and preserve the original file for dispute resolution.

Avoid preventable change-order errors

  • Unclear scope descriptions can leave owners and contractors disputing what work, materials, or exclusions the change order actually approves.
  • Missing cost and schedule fields make it difficult to connect the approved revision to payment applications and the project baseline.
  • Routing a change order to unauthorized recipients can weaken approval evidence and create uncertainty about who accepted the revised terms.
  • Separating the signed PDF from its Audit Trail can make the project record harder to authenticate during a payment or delay dispute.

Risks of incomplete change orders

Scope dispute

Scope dispute

Payment dispute

Payment disagreement

Approval gap

Approval uncertainty

Incomplete record

Weak evidence

Legal value of a signed change order

A signed change order creates a clearer record of agreed construction scope, price, and schedule revisions, helping reduce disputes over authorization. Under ESIGN, 15 U.S.C. ch. 96, and applicable UETA or New York ESRA rules, electronic signatures may carry legal effect when intent, consent, attribution, and record retention are established; contract and state requirements still control.

Why teams look for DocuSign alternatives

Troubleshoot construction change-order signing

Resolve field, routing, plan, enforceability, retention, and integration questions before the revised construction terms are circulated.

Upload the change-order PDF to signNow, then add fields for the revised scope, dollar amount, schedule impact, approvals, and signatures. If the document is scanned, review detected fields manually before sending so every required construction detail has an assigned recipient.

A sender can place signature fields for the owner, contractor, architect, or other authorized parties and assign each field to a recipient. Use the routing order when the contract requires sequential approval, rather than relying on recipients to coordinate manually.

The signNow Business plan includes legally binding eSignatures, templates, mobile apps, and audit trails at $8 per user per month with annual billing. Business Premium adds bulk send, while Enterprise adds advanced signer authentication and conditional fields.

ESIGN and UETA generally recognize electronic signatures when intent, consent, attribution, and record retention requirements are satisfied. Confirm that the contract and applicable state law permit electronic execution, especially when a separate notarization or government filing is required.

Export the completed PDF and its signNow Audit Trail after all construction parties sign. Store both with the project contract, supporting quotation, drawings, and approval correspondence so the executed revision can be reconstructed during payment or dispute review.

signNow offers Procore, NetSuite, Google Drive, Box, Egnyte, and other integrations. If your project system is not connected through an available integration or API configuration, download the executed change order and upload it under your organization’s document-control procedure.

ROI at a Glance

Key performance indicators that demonstrate SignNow's proven track record.

28M+Documents signed
13+Years in business
4.6/5Average G2 rating

BE READY TO GET MORE

Get this form now!

If you believe that this page should be taken down, please follow our DMCA take-down process.