Download signNow app
4.7 / 5 rating on

Building Permit

Use a Building Permit 2015 template to make your document workflow more streamlined.

What a Building Permit is and how it works

A Building Permit is an approval document used by a local building department to authorize specified construction, alteration, or repair work. The exact fields, supporting plans, fees, inspections, and signatures depend on the issuing jurisdiction and project type. In a signNow workflow, upload the department’s PDF, review or add fillable fields, assign owners, contractors, designers, or officials, and send the document for signature where electronic signing is accepted. signNow records signer actions and timestamps in an audit trail, but the local authority decides whether electronic submission or signatures satisfy its rules.

Who uses a Building Permit workflow

Property development

A property owner or developer can use a Building Permit workflow to collect contractor, architect, and owner approvals before submitting project details to the responsible building department. signNow templates, required fields, and audit trails help keep each approval connected to the submitted version.

Construction operations

Construction companies and general contractors can route Building Permit packages among project managers, subcontractors, and owners. The workflow keeps responsibility visible, supports mobile signing from a jobsite, and preserves the completed approval record for project files and agency follow-up.

Building Permit workflow setup

Configure identity, signatures, evidence, storage, and access controls before routing a Building Permit for approval.

SettingRecommendation
Authentication and user provisioningVerified accounts with administrator-managed invitations
Signature typeLegally binding electronic signature with signer intent
Audit trailEnable timestamps and export after completion
Document retentionFollow the issuing authority’s written schedule
EncryptionUse TLS in transit and AES-256 at rest

How to complete a Building Permit

Use the issuing department’s current form, verify every project detail, and route only the signatures that local rules permit electronically.

  • Upload form:

    Upload the building department’s current PDF
  • Check details:

    Review fields for address, scope, and signatures
  • Add signers:

    Assign each owner, contractor, or reviewer
  • Request signatures:

    Send the permit for approved electronic signatures
  • Store records:

    Download the completed permit and audit trail
be ready to get more
Get legally-binding signatures now!
  • Best ROI. Our customers achieve an average 7x ROI within the first six months.
  • Scales with your use cases. From SMBs to mid-market, airSlate SignNow delivers results for businesses of all sizes.
  • Intuitive UI and API. Sign and send documents from your apps in minutes.

Building Permit workflow features

signNow combines field preparation, approval routing, mobile access, and audit evidence for teams coordinating Building Permit documents across a project.

Field preparation

Upload the department’s PDF and place required fields for project addresses, descriptions, contacts, approvals, and signatures without rebuilding the Building Permit from scratch.

Role assignment

Assign owners, contractors, designers, or reviewers to the exact fields they must complete, reducing confusion when several participants approve one permit package.

Remote routing

Send the Building Permit by email or signing link, allowing authorized participants to review project information without coordinating every approval in person.

Mobile signing

Use signNow mobile apps when project participants need to review or sign permit documents from a jobsite, office, or inspection meeting.

Audit evidence

Capture timestamps and signer activity in an audit trail that remains associated with the completed Building Permit and supports later record review.

Record continuity

Store the executed permit and completion evidence together so project teams can retrieve the approved version when communicating with the building department.

Building Permit integration options

Connect permit approvals with project, document, and business systems using named signNow integrations such as Procore, Salesforce, Microsoft 365, Google Drive, Box, Egnyte, and NetSuite.

Salesforce
Procore
Zapier
Microsoft Teams
Hub spot
Box
Microsoft

Find and fill out the correct building permit

airSlate SignNow helps you fill in and sign documents in minutes, error-free. Choose the correct version of the editable PDF form from the list and get started filling it out.

VersionsForm popularityFillable & printable
UT Building Permit Application - Mapleton City 20154.8 Satisfied (3110 Votes)
UT Building Permit Application - Mapleton City 20084.7 Satisfied (149 Votes)

Building Permit platform requirements

Use signNow through Chrome, Firefox, Safari, or Edge on Windows or macOS. signNow also provides mobile apps for iOS and Android, allowing permit participants to review and sign from supported devices.

  • Browsers Chrome, Firefox, Safari, and Edge
  • Operating systems Windows, macOS, iOS, and Android
  • Access methods Desktop browser and signNow mobile apps

Organizations should manage access through approved accounts and devices, especially when permit files contain property, financial, or contact information. Test the issuing department’s submission process separately, because browser access to signNow does not establish that a local agency accepts electronic filing.

Building Permit security controls

Transport encryption:

TLS 1.2/1.3 for data in transit

Storage encryption:

AES-256 encryption for stored documents

Security certification:

SOC 2 Type II certification available

Information security:

ISO 27001 certified information security

Electronic signatures:

ESIGN and UETA compliant eSignatures

Protected information:

HIPAA compliance available with BAA

Building Permit audit trail steps

A signNow audit trail helps connect each Building Permit signature to the signer, time, document version, and completion history.

01

Authenticate signer:

Record the signer’s authentication event and access method.
02

Timestamp actions:

Capture the exact time for each permit action.
03

Link document:

Associate the completed document with its audit record.
04

Seal evidence:

Preserve changes through a tamper-evident completion record.
05

Log activity:

Record delivery, viewing, signing, and completion events.
06

Retrieve records:

Export the Building Permit and audit trail together.

Building Permit record-keeping practices

A defensible permit file connects the approved document, supporting attachments, signer evidence, and the retention rule selected by the issuing authority.

Confirm the authority’s retention schedule

Ask the issuing building department which records it requires and retain the completed permit, attachments, and signNow audit trail for that period. State requirements can exceed federal benchmarks, so document the governing agency and review its retention schedule before deletion.

Export the permit and audit trail

Export the completed Building Permit and its signNow audit trail together. Keep timestamps, signer activity, delivery history, and the final PDF in a controlled folder so reviewers can connect the approval evidence to the exact permit version.

Archive the signed record securely

Use access-controlled storage with encryption at rest and role-based permissions for permit records. Restrict editing after completion, preserve the original file, and record any later copy or transfer without overwriting the signed document.

Separate drafts from executed permits

Keep superseded Building Permit drafts separate from the executed version. Apply a clear naming convention containing the project address, permit type, and completion date, then preserve the final document in a format that can be reproduced for inspection.

Building Permit troubleshooting questions

These answers address signature, compliance, plan, and record-keeping issues that can affect a Building Permit workflow in signNow.

If a local building department requires an ink signature or notarization, signNow cannot replace that legal step. Confirm the authority’s requirements, use signNow for permitted approvals, and retain the completed record and audit trail alongside the issued permit.

The signNow Business plan includes templates, audit trails, mobile apps, and legally binding eSignatures at $8 per user monthly when billed annually. Business Premium adds bulk send, while Enterprise adds advanced signer authentication and formula fields.

A missing project address or legal description is a form-completion issue, not a signNow error. Update the uploaded Building Permit template, check required fields before sending, and confirm the reviewing authority’s field requirements before collecting signatures.

For consumer-facing electronic records, ESIGN requires disclosure of the right to receive paper records and access to the electronic format. Configure the disclosure before requesting a signature when the permit workflow involves consumers.

Signers can receive a Building Permit by email or a shareable signing link. If stronger identity evidence is needed, use signNow authentication options available to your plan and document the local authority’s acceptance requirements.

A signed Building Permit should remain connected to its audit trail, including timestamps and action history. Export both from signNow after completion, then preserve them under the applicable state or agency retention policy.

ROI at a Glance

Key performance indicators that demonstrate SignNow's proven track record.

28M+Documents signed
13+Years in business
4.6/5Average G2 rating

BE READY TO GET MORE

Get this form now!

If you believe that this page should be taken down, please follow our DMCA take-down process.